Chf. Engineer: Duo Maxwell (dmaxwell_ip) wrote in interprev,
Chf. Engineer: Duo Maxwell
dmaxwell_ip
interprev

  • Mood:

field update

dispatched at 0430 in the god-damned am today, team MOLE01 (as lt. commander is ohsoadamant about calling it) has pulled into position and is currently waiting hq instructs and the go-to for OPERATION SAVETHATSTUPIDJERK. er. operation Gr-9134801.
  • Post a new comment

    Error

    Comments allowed for members only

    Anonymous comments are disabled in this journal

    default userpic

    Your IP address will be recorded 

  • 0 comments